GE SETUP

Pipe & Drape Diagram

PIPE & DRAPE DIAGRAM

After the Oct 13 Sunday, we've decided to reduce the amount of drape used in the hallways. Reference the diagram above for the new setup.

Courtyard Entrance

COURTYARD ENTRANCE

Entrance of the courtyard from the parking lot

Connections Tent #1

CONNECTIONS TENT #1

Connections tent plus banner closest to the parking lot

Connections Tent #2

CONNECTIONS TENT #2

Connections tent plus banner closest to the front door

Raleigh Skyline Banner

RALEIGH SKYLINE BANNER

Goes in between pillars under the breezeway

Front Entrance

FRONT ENTRANCE

The banner, A-Frame, and tension banner that goes outside the front door

Front Entrance

eHQ HALLWAY

The banner we use to block the hallway that leads to eHQ.

BATHROOM HALLWAY

Main hallway facing the bathrooms. Note that the banner should be positioned against the wall and the black drape is angled diagonally. The aim is to use the banner and drape to conceal the hallway behind it.

AUDITORIUM HALLWAY

Two piece Raleigh banner that guests see as they come down thru the marble hallway. Always use carpeted bases!

AUDITORIUM ENTRANCE

Elevation Raleigh banner outside the auditorium doors. Always use carpeted bases!

eKIDZ CHECK-IN

Drapes and banner used in the eKidz entrance area.